2 research locations

A prototype 800L continuous stirred tank reactor will be designed and built at the biogas plant in Lagada, which will operate with real substrates. Later, the prototype reactor will be transferred to the unit of Bioenergy Nigrita S.A., where different substrates will be used to ensure the reliability of the system under different conditions (different substrates and different operating conditions).

Biogas Lagada

Bioenergy Nigrita

Skip to content